Performance Evaluation of Air Pollution Control System (APC) of Raymond UCO Denim Pvt. Ltd., Yavatmal, (Year : 2018)
|
To conduct the performance evaluation of all Air Pollution Control system of Raymond UCO Denim Pvt. Ltd.
|
|
Assessment of Status of Solid Waste Management in Metro Cities, State Capitals, Other Cities and Towns, CPCB, New Delhi, (Year : 2004-2005)
|
No information is available
|
|
Design of Wastewater Collection System for Agra Master Plan, (Year : 2018)
|
No information is available
|
|
Assessment of Post Impact of Fire Hazard at TSDF Facility of Bharuch Enviro Infrastructure Ltd., Ankleshwar, Gujarat, (Year : 2018)
|
No information is available
|
|
EIRA of Proposed Thermal Power Project near Akurumukutu, Nagapattinam, District (Tamilnadu)., (Year : 2017)
|
No information is available
|
|
Development and demonstration of low cost fuel from agricultural waste, (Year : 2018)
|
Development of biomass briquettes from leaves and agricultural wastes and their burning efficiency in cook stove.
|
|
EIRA for the Proposed Excel Solvent Spun Cellulosic Fibre (109500 TPA) alongwith CPP at Birla cellulosic, Kharach, Dist. Bharuch, Gujarat , (Year : 2018)
|
No information is available
|
|
Design and Development of Sustainable Remediation Process for Mitigation of Arsenic Contamination in Ground Water, (Year : 2018)
|
No information is available
|
|
Environmental Impact and Risk Assessment of Proposed 500 MW Lignite Based Thermal Power Plant at Padva, Dist. Bhavnagar, Gujarat, (Year : 2018)
|
No information is available
|
|
Status of Methane Emissions from Municipal Solid Waste Disposal Sites in Nagpur and Adjoining Cities, (Year : 2004-2005)
|
No information is available
|
|
Development of a new model for risk assessment of urban water distribution system , (Year : 2016)
|
The objective of the project is to develop user interactive software i.e. Risk-PiNet for risk assessmnet in water distribution system. RISK-PiNET identifies the pipes with the greatest risk of hydraulic deficiencies and structural failure. It generates a prioritized list of pipes those require rehabilitation. The software is developed using Microsoft Excel VBA 2010 which is integrated with QGIS 2.8.3 for GIS mapping, spatial analysis, mathematical modelling and visual display of model results for pipe vulnerability, hazards and risk.
|
|
Assessment of Remediation of Hazardous Waste Contaminated Areas in and around M/s Union Carbide India Ltd. (UCIL), Bhopal, (Year : 2017)
|
No information is available
|
|
Rapid Environmental Impact Assessment (EIA) for proposed Lignite Based 135 MW Power Plant at Tadkeswar, Surat , (Year : 2017)
|
Environmental Impact Assessment (EIA) for proposed Lignite Based 135 MW Power Plant
|
|
Ground Water Quality Modelling and Contamination Assessment in Choutuppal Industrial Area, (Year : 2018)
|
Assessment of groundwater quality, surface water quality and soil quality has been carried out in and around the Choutuppal industrial area during April 2016. Groundwater modelling and contamination assessment has been carried out based on both primary and secondary data collected during the study period. Remedial measures have been suggested to minimize the contamination of ground water.
|
|
Assessment of Impact of Sewage Disposal of Nagpur City on Gosikhurd Reservoir and Delineation of Mitigation Measures for Minimization of Pollution, (Year : 2015)
|
No information is available
|
|
Short Term Air Pollution Control System for Green Crematorias, Dumpsite and Others in Delhi, Delhi Pollution Control Committee, Delhi, (Year : 2016)
|
The objective and scope of short term and localised air pollution control system for crematoria, dumpsites, brick kilns and others in Delhi are:
- Assessment of quantity and quality of cow dung.
- Finding out possibilities to cow dung to produce electricity, briquettes, fuel pellets.
- Cost benefit analysis of the recycled product.
|
|
Preparation of DPR of Solid Waste Management at Kota, (Year : 2004)
|
No information is available
|
|
Impact Assessment and Submergence Scenario of Aliya Bet due to proposed Dam in gulf of Khambat , (Year : 2012)
|
Submergence of Aliyabet was studied due to proposed dam in gulf of Khambat using GIS and RS
|
|
Comprehensive Audit of Solid Waste Generation at M/s Chennai Petroleum Corporation Ltd., Chennai, (Year : 2018)
|
No information is available
|
|
EIRA studies for proposed Lignite based 500 MW power plant at Padva in Bhavnagar District, Gujarat., (Year : 2018)
|
No information is available
|