|
In-house R&D Projects Development of GIS based Environmental Modeling Tools, (Year : 2018)
|
No information is available
|
|
Augmentation of Water Supply System of Agra : Pre-design Cost Estimate, (Year : 2018)
|
No information is available
|
|
Design of Wastewater Collection System for Agra Master Plan, (Year : 2018)
|
No information is available
|
|
Synthesis of nanoparticle impregnated on apple pomace(waste) for removal of heavy metals from wastewater, (Year : 2017)
|
No information is available
|
|
CSIR- Network Project Multi Scale Modelling Platform for Environmental Forecasting & Management CMM-20, (Year : 2017)
|
No information is available
|
|
Technical Consultancy & Supervision for the Severage implementation project at Udaipur, (Year : 2017)
|
No information is available
|
|
Verification of Annual Mine Closure Activities of Open Cast Lignite Mine of M/s BLMCL at Barmer district of Rajasthan, (Year : 2016)
|
No information is available
|
|
Development of Pollution Abetament Strategies For Damodar River System, (Year : 2016)
|
No information is available
|
|
Development of a new model for risk assessment of urban water distribution system , (Year : 2016)
|
The objective of the project is to develop user interactive software i.e. Risk-PiNet for risk assessmnet in water distribution system. RISK-PiNET identifies the pipes with the greatest risk of hydraulic deficiencies and structural failure. It generates a prioritized list of pipes those require rehabilitation. The software is developed using Microsoft Excel VBA 2010 which is integrated with QGIS 2.8.3 for GIS mapping, spatial analysis, mathematical modelling and visual display of model results for pipe vulnerability, hazards and risk.
|
|
Pollution Monitoring, Mitigration System and Device - estimation of assimilative capacity of environmental media of select region, (Year : 2016)
|
No information is available
|
|
GIS based water distribution system optimization software, (Year : 2016)
|
No information is available
|
|
Comprehensive Environmental impact Assessment for Mumbai Sewage Disposal Project Phase - II Priorty work, (Year : 2015)
|
No information is available
|
|
Study of groundwater aquifer system at Jaganath Puri and its protection from contamination, (Year : 2015)
|
No information is available
|
|
Ecological Engineering Measures for the Restoration of Lake Ecosystems at Udaipur, (Year : 2015)
|
No information is available
|
|
Development of an emission inventory for the city of Chandrapur as part of a comprehensive city development plan, (Year : 2013)
|
No information is available
|
|
Development of low cost catalyst for 2 wheelers to meet Bharat Stage-III norms, (Year : 2012)
|
No information is available
|
|
Impact Assessment and Submergence Scenario of Aliya Bet due to proposed Dam in gulf of Khambat , (Year : 2012)
|
Submergence of Aliyabet was studied due to proposed dam in gulf of Khambat using GIS and RS
|
|
GIS-Based mapping of Water Distribution System and Integration Risk Assessment in Nagpur city, (Year : 2010-2012)
|
Integrated Risk Assessment of Water Distribution System was undertaken in pilot areas of Nagpur city in Water safety Plan Project
|
|
GIS-Based mapping of Water Distribution System and Integration Risk Assessment of Risk Prone Area for High Contamination Probabilities, (Year : 2008)
|
Integrated Risk Assessment of Water Distribution System was undertaken in 3 pilot areas of Hyderabad city in Water safety Plan Project
|
|
Development of GIS- Based Modelling Tool for non-point source Pollution Assessment in a watershed, (Year : 2005-2008)
|
A non-point souce pollution asseement modelling tool was developed for agricultural watershed.
|