|
Environmental Impact Assessment of proposed FSRU based LNG Terminal at Kakinada Deep water port, Kakinada, East Godavari District, Andhra Pradesh , (Year : 2018)
|
No information is available
|
|
EIRA studies for proposed Lignite based 500 MW power plant at Padva in Bhavnagar District, Gujarat., (Year : 2018)
|
No information is available
|
|
Assessment of Environmental Impacts due to Gold Jewellery Manufacturing Unit on the Food Processing Units and Immediate Vicinity in KINFRA Techno Industrial Park, Kozhikode, (Year : 2018)
|
M/s. MGPL approached CSIR-NEERI for conducting a study to assess the environmental impacts of the gold jewellery-manufacturing unit on the surrounding vicinity comprising the food processing units in KINFRA-TIP.
As per the Honourable High Court Order, based on the technical discussions, and the information provided by MGPL, an environmental assessment study has been carried out during December 2016 to January 2017 for assessment of impacts on various environmental components like air, noise, land and water in the surrounding vicinity including food processing units in KINFRA industrial techno park due to the proposed jewellery manufacturing unit. The baseline environmental status w.r.to air, water, land and noise has been established during the winter season. An EMP is proposed based on the observations and findings from the environmental assessment study.
|
|
Grid analysis study for Assessment of Environmental Impacts due to Operation of MRPL (Phase III) on Air, Noise and Groundwater in Surrounding Villages. , (Year : 2018)
|
The environmental quality and the impact of Phase III units in the study area after the implementation of pollution control measures has been evaluated by monitoring and modeling exercises during the Phase II (December 2017) of the study. The environmental quality data comprising ambient air quality, fugitive emissions, noise levels, traffic intensity and ground water quality have been monitored in the study area during Phase II of the study. The cumulative impact assessment due to continuous sources in the MRPL refinery and the impact of fugitive emissions and odorous pollutants on the air environment in the study area have also been assessed during Phase II of the study to evaluate the post EMP implementation scenario. Also groundwater quality and noise levels are assessed during Phase II.
|
|
Ground Water Quality Modelling and Contamination Assessment in Choutuppal Industrial Area, (Year : 2018)
|
Assessment of groundwater quality, surface water quality and soil quality has been carried out in and around the Choutuppal industrial area during April 2016. Groundwater modelling and contamination assessment has been carried out based on both primary and secondary data collected during the study period. Remedial measures have been suggested to minimize the contamination of ground water.
|
|
Integrated EIA of Proposed open cast Mining at Ghogha-Surka, Khadsaliya-II and Khadsaliaya-I Lignite mines, Bhavnagar District, Gujarat, (Year : 2018)
|
NEERI carried out the study related to identification, prediction and evaluation of significant impacts and delineation of pragmatic Environmental Management Plan (EMP) to mitigate the potential adverse impacts from proposed open cast lignite mining at Ghogha-Surka, Khadsaliya-II and Khadsaliaya-I.
|
|
Crisis / Disaster Management Plan for the Development of the Existing Puducherry Port into a Deep Water Modern Port, (Year : 2018)
|
No information is available
|
|
Environmental Impact and Risk Assessment of Proposed 500 MW Lignite Based Thermal Power Plant at Padva, Dist. Bhavnagar, Gujarat, (Year : 2018)
|
No information is available
|
|
Study on Odour Control in and around A.P. Paper Mill, Rajahmundry , (Year : 2018)
|
No information is available
|
|
Environmental Assessment of ARCI Complex as per TSPCB Consent Order, (Year : 2017)
|
M/s. ARCI retained CSIR-NEERI for conducting an environmental assessment study with reference to the consent order given by TSPCB. CSIR-NEERI Hyderabad zonal centre conducted an environmental assessment study for the assessment of impacts due to the identified sources on various environmental components like air, noise and water/wastewater within the ARCI campus. Based on the existing environmental data and the information given by the ARCI, evaluated and predicted environmental impacts and prepared environmental management plan.
|
|
EIRA of Proposed Thermal Power Project near Akurumukutu, Nagapattinam, District (Tamilnadu)., (Year : 2017)
|
No information is available
|
|
Rapid Environmental Impact Assessment (EIA) for proposed Lignite Based 135 MW Power Plant at Tadkeswar, Surat , (Year : 2017)
|
Environmental Impact Assessment (EIA) for proposed Lignite Based 135 MW Power Plant
|
|
Assessment of outdoor and indoor air quality status at Salarjung Museum, Hyderabad, (Year : 2017)
|
Outdoor air quality and IAQ studies were carried out, during three seasons (Winter, Summer and Post-monsoon) seasons, to know the present air quality status in and around the galleries of SJM and its effect on objects of global art collection. Possible preventive measures are recommended in the report based on the indoor and outdoor air quality data for selected parameters to avoid further deterioration.
|
|
Comprehensive Environmental Impact and Risk Assessment (CEIRA) for Proposed Zircaloy and Pressurized Heavy Water Reactor (PHWR) Fuel Fabrication Facilities and Township Development at Rawatbhata, Kota,Rajasthan, (Year : 2017)
|
No information is available
|
|
Environmental Impact and Risk Assessment of Proposed 1000 MW Thermal Power Plant at Marudampallam, Nagapattinam Distt. Tamil Nadu, (Year : 2017)
|
No information is available
|
|
Major past projects, (Year : 2017)
|
No information is available
|
|
Evaluation of EMRION Nano Technology based water Treatment Plant installed at lake View Guest House, Hyderabad, Telangana, (Year : 2016)
|
Rural Water Supply and Sanitation (RWS&S) Department, Govt. of Andhra Pradesh has retained CSIR-NEERI Hyderabad Zonal Laboratory, Hyderabad to undertake the evaluation of EMRION Nano Technology solution plant of M/s Eesavyasa Technologies Pvt. Ltd., Hyderabad and to provide recommendations on the technology.Performance evaluation of EMRION Nano Technology Solution based De-fluoridation and TDS reduction plant installed at Lake View Guest house was carried out with respect to water quality under prevailing operating conditions.
|
|
Performance Evaluation of Effluent Treatment Plant at International Paper - Andhra Pradesh Paper Mill, Rajahmundry, (Year : 2016)
|
Carried out the Assessment of the performance evaluation of existing Effluent Treatment Plant of IP-APPM at Rajahmundry. Effluent samples from various locations of ETP and Godavari River water samples were collected and analyzed for detailed physico-chemical parameters. Based on the pollution load and design specifications provided by IP-APPM, all the units of ETP found adequate to handle and treat the effluent generated to meet discharge standards. Based on the study report, recommendations were delineated to achieve the designed performance of ETP.
|
|
Fresh Assessment of Land treatment system at Toorupu Lanka, (Year : 2016)
|
Assessment of Land treatment system
|
|
Risk assessment for the development of existing Puducherry Port into a deep water modern port., (Year : 2016)
|
No information is available
|