Warning (2): filesize(): stat failed for # [APP/Template/Contents/recruitment.ctp, line 70]
Recruitment Types | Document Forms |
---|---|
Description | Recruitment type | Date of opening | Date of closing |
---|---|---|---|
RESULT OF INTERVIEW HELD ON 17-08-2023 ADVERTISEMNET NO.: 01/June2023/CTMD [0.38 MB] |
6-10-2023 | ||
RESULT OF INTERVIEW HELD ON 18-08-2023 ADVERTISEMNET NO.: 02/May2023/EMD/DST_CoE, Under project: Centre of Excellence for Climate Change Research (DSTCoE-CCR) (GAP-2835) [0.38 MB] |
6-10-2023 | ||
RESULT OF WALK-IN-INTERVIEW HELD ON 23-08-2023 ADVERTISEMNET NO.: 01/June/2023/BDPMD [0.27 MB] |
6-10-2023 | ||
RESULT OF INTERVIEW HELD ON 18-08-2023 ADVERTISEMNET NO.: 01/May2023/EMD/DST_CoE under project Centre of Excellence for Climate Change Research (DSTCoE-CCR) (GAP-2835) [0.38 MB] |
6-10-2023 | ||
(CSIR-FTC) Utilization of compost booster for newly designed and developed sanitary dry toilets with recovery of fertilizer from human urine in Himalayan Region - Online Advt. No. WWTD_SEP2023 [0.12 MB] |
20-09-2023 | ||
Recruitment for 1 (Nos) Project Assistant for project “TSP-2682 Technical services for environmental monitoring, testing of devices and resource assessment” Online Ref. No. Recruit_ermd_05092023.pdf [0.22 MB] | 19-09-2023 | ||
Result of Project Associate-II under project title “Management of R&D Services for Analytical Activities of CSIR-NEERI (SEAF) (OLP-48 [0.38 MB] | 3-10-2023 | ||
Result of Scientific Administrative Assistant under project title Capacity Building of Professionals (TSP-2308) [0.28 MB] | 3-10-2023 | ||
Particulate matter speciation study at Ras Laffan Industrial City, Doha, Qatar. (C-5- 2637), Online Ref : Recruit_APC_30082023 [0.4 MB] |
13-09-2023 | ||
Result of Project Associate-I under project title “Preparation of DPR on Phyto and Bio Remediation of In-Situ drain treatment system in Pathankhera and Shobhapur Townships of Sarni Nagar Palika” (CNP-2834) [0.37 MB] | 28-09-2023 | ||
Result of Project Associate-I under project title “Management of activities of Journal Environmental Science & Engineering (OLP-58)” [0.39 MB] | 28-09-2023 | ||
Result of Project Associate-I under project title “Environmental Monitoring and Assessment for Utilization of Jarofix Waste in Road Construction at Kota And Boondi Sites by Hindustan Zinc Limited (HZL), Chanderia (Phase-I for Kota Site) (C-2828)” [0.38 MB] | 29-09-2023 | ||
Recruitment for 1 (Nos) Project Assistant-I and 1 (Nos) Project Assistant-II for Project titled “Large Scale Dissemination of Low Cost Improved Chulhas (Cookstoves) and Estimation of Health and Environmental Benefits CNP-2872 Online Ref. Recruit_ermd_25082023 [0.17 MB] | 8-09-2023 | ||
1 No., Project Associate-I Preparation of Feasibility Report and Detailed Project Report for In-situ Drain Treatment of Dry Weather Flow Entering into Drain of Eastern Suburbs of Mumbai Online Ref. no. recruit_WWTD_24082023 [0.28 MB] | 8-09-2023 | ||
Result of Project Associate-II under project title “Addressing Vehicular Traffic Induced Road dust re-suspension with S&T based action plans for Air Quality Improvement in Delhi NCR (GAP-2853)” [1.44 MB] | 21-09-2023 | ||
Result of Project Associate-II under project title “Development of 3 Tier monitoring mechanism for ensuring compliance of environmental conditions (CNP-2730)” [1.51 MB] | 21-09-2023 | ||
Result of Project Associate-II under project title “ Impact Assessment of Activities Existing within the 500m of Taj Mahal Premises on the Taj Mahal and Suggestion thereby on shifting or closure of the Activities (CNP-2848)” [1.45 MB] | 21-09-2023 | ||
Recruitment for 2 (Nos) Project Associate-I for Project Technical Audit of Biomining Plants and Technical Vetting of MSW Projects Sangli, (TSP-2871) Online Ref. recruit_CHWMD_10082023 [0.18 MB] | 6-09-2023 | ||
Recruitment for 1 No. Project Assistant For project no. G-2761 (Emission Inventory, Source Apportionment and Carrying Capacity Study of Barrackpore Police Commissionerate Area in West Bengal (module 1), Emission Inventory, Source Apportionment and Carrying Capacity Study of Haldia City in West Bengal (Module 2)) Online Ref. recruit_KZC_17082023A [0.14 MB] | 10-09-2023 | ||
Recruitment for 1 No. Project Associate-IFor project no. C-2777 (Emission Inventory and Source Apportionment study of Byrnihat and EPIP area in Ri-Bhoi District of Meghalya) Online Ref. No. recruit_KZC_17082023B [0.14 MB] | 10-09-2023 |