|
Integrated Impact Assessment Study for Mithi River , (Year : 2016)
|
No information is available
|
|
Development of Guidelines for Preparation of Environmental Management and Monitoring Plan(EMMP) & Post EMP Monitoring for JN Port, (Year : 2016)
|
No information is available
|
|
Draft Terms of Reference for Revival of Defunct Oxidation Ponds, Kair Villages and Aaya Nagar and through Engineered Ecological System of Treatment of Waste water and Creation of a Tourist Attraction, (Year : 2016)
|
No information is available
|
|
Quality Assessment and Verification for Adequacy Report of Technocraft Industries (India) Limited, (Year : 2016)
|
No information is available
|
|
Short term plan for cleanup of nallah wastewater in Ulhasnagar by Sustainable and Natural Processes, (Year : 2016)
|
No information is available
|
|
Traffic Junction Air Pollution Abatement Plan, (Year : 2016)
|
No information is available
|
|
Preparation of Plan for SWM and Wastewater Treatment for Palghar , (Year : 2015)
|
No information is available
|
|
DesIndrani Guptan of Underground Drainage System and Sewage Treatment Plant at Arvi Nagar Parishad, Arvi, Dist. Wardha, (Year : 2015)
|
No information is available
|
|
Ambient Air Quality Monitoring for DHT and associated facility project at BPCL, Mumbai Refinery , (Year : 2015)
|
No information is available
|
|
Impact Assessment Study to Assess the Feasibility of allowing Urban Renewal Scheme Under Section 33(9) Of DCR 1991 in Suburban Area of Mumbai for MCGM, (Year : 2015)
|
No information is available
|
|
Study and report to Supreme Court on Mithi River Status after 26 July 2005 Deluge by IIT Bombay & NEERI, (Year : 2015)
|
No information is available
|
|
Study & design the effective method for treating sewage water in NDMC area by constructing small decentralized sewage treatment plants., (Year : 2015)
|
No information is available
|
|
Study the possibilities of remediation and restoration via natural and sustainable system of the identified water bodies, (Year : 2015)
|
No information is available
|
|
Assessment of impact of tree cutting for construction of drama theatre (Civil application no. 30 of 2017), (Year : 2015)
|
No information is available
|