Designation: |
Senior Scientist
|
Email Id: | s[dot]kumari[at]neeri[dot]res[dot]in |
Qualification: | PhD (Engineering) |
Specialization: |
Clean Energy, Solar Energy Utilization and Waste to Value Creation.
|
Address: |
Sub-Verticals 4B: Climate Change and Green Materials, NEERI, Nagpur
|
Biodata: |
Sr. No. | Project Name |
---|---|
1 |
Assessment and Dispersion of odorous gases due to CETP at Fabcity, Raviryal Village, Maheswaram (M), Rangareddy District
|
2 |
Comprehensive Groundwater Quality Assessment and Pollution Source Identification using Stable isotopic and Groundwater Modelling studies in and around Chemical Division, GIL, Nagda
|
3 |
Adequacy assessment for augmentation of SBP & AAC plant capacities and the proposed PAC unit at Grasim Industries Ltd., Rehla, Dist. Palamu, Jharkhand
To study the impacts on the environment due to augmentation of SBP and AAC and the proposed PAC unit |
4 |
Feasibility study for installed Piezometric wells in and around Divi's Laboratories Lingojigudem Village, Choutupal Mandal, Telangana
|
5 |
Assessment of ground water quality in and around Grasim Industries Limited, Nagda
|
6 |
Assessment of Environmental Impacts in and around Kohlar Industrial area, Bidar district, Karnataka
|
7 |
Environmental Impact Assessment Studies for Establishment of CETP(s) and Selection of Marine Outfall Location for Discharge of Treated Effluent from Proposed CETP(s)
|
8 |
Assessment of Environmental Impacts due to Gold Jewellery Manufacturing Unit on the Food Processing Units and Immediate Vicinity in KINFRA Techno Industrial Park, Kozhikode
M/s. MGPL approached CSIR-NEERI for conducting a study to assess the environmental impacts of the gold jewellery-manufacturing unit on the surrounding vicinity comprising the food processing units in KINFRA-TIP. As per the Honourable High Court Order, based on the technical discussions, and the information provided by MGPL, an environmental assessment study has been carried out during December 2016 to January 2017 for assessment of impacts on various environmental components like air, noise, land and water in the surrounding vicinity including food processing units in KINFRA industrial techno park due to the proposed jewellery manufacturing unit. The baseline environmental status w.r.to air, water, land and noise has been established during the winter season. An EMP is proposed based on the observations and findings from the environmental assessment study. |
9 |
Assessment of Groundwater quality in and around Lanxess unit and Geo-chemical modelling studies for Lanxess India Pvt Ltd., Nagda
"Groundwater quality in and around Lanxess unit and Geo-chemical modelling studies" |